Saturday, March 21, 2015

DIRECTOR HUMAN RIGHTS, APPLICATION TO CONSTRUCT THREE (03) DRAINAGE SYSTEM /WATER COURSE BRIDGES BETWEEN THE UNDER CONSTRUCTED METALED ROAD






IN THE COURT OF DISTRICT JUDGE / DIRECTOR HUMAN RIGHTS GHOTKI
Misc: App: No.         2015


Muhammad Mithal S/o Abdul Rehman Panhwar
By profession an Advocate,
Resident of Village Abdul Rehman Panhwar near Ice Factory,
(Jalbani law chamber, lawyer’s street)
Taluka Miprur Mathelo District Ghotki ……………………………Applicant

V E R S U S

1          Chief Executive Engineer
Highway Division Ghotki

2.         SDO Roads, Mirpur Mathelo

3.         Circle Officer,
Anti-corruption Establishment Circle, Ghotki

4.         Deputy Commissioner
District Ghotki @ MiprurMathelo ………………………. Respondents


APPLICATION TO CONSTRUCT THREE (03) DRAINAGE SYSTEM /WATER COURSE BRIDGES BETWEEN THE UNDER CONSTRUCTED METALED ROAD


I the undersigned applicant state as under,

1.                  That I am the law abiding citizen of Pakistan and residing @ above address within this Honorable Court's jurisdiction.


2.                  That about 03 years ago (in the year 2012) the contract of metaled road with 03 drainage system /water course bridges from by-pass Mirpur Mathelo to Belo Mirpur/village Abdullah Marnass via Village Abdul Rasool Khoso & Village Abdul Rehman Panhwar about 1.5 km was approved and tendered by the Sindh Government through the respondent no.1, as the information acknowledged from the office of respondent no.1.

3.                  That the construction of road was started without construction of 03drainage system /watercourse bridges by the petty contractor.

4.                  That the villagers reached to respondent no.01 and requested for construction of 03 drainage system / watercourse bridges between the under constructed road but the respondent no.1 also given hopes but no any action taken till to date.

5.                  That the solid bricks were bought by the contractor on site and after few days later the solid bricks lifted by some unknown persons as the construction of  03 drainage system / water course bridges may delay and interrupted.


6.                  After that Mr. Ubedullah soomro presently DSP Admin @ SSP office and other villagers have been move the many applications to construct the 03 water course/drainage system bridges in under constructed road to respondent no.1 to 4 as on dated 27.04.2013, 29.05.2013, 24.06.2014, 05.08.2014, 29.08.2014, 15.12.2014 & 13.01.2015, But till to date there is no response to construct the said bridges for drainage the land and crossing of rain both side to road.


7.                  That during construction of metaled road in the monsoon season, it was rained about 2 weak continuously. Due to filling of mud in the under constructed road about 05 feet’s from land and non-construction of 03 drainage/watercourse bridges, the rainy water was stopped because there is no another way to cross the filled mud between the under constructed road.


8.                  That due stop of mud / road, the rainy water comes into our houses and residential buildings & boundaries walls were cracked and damaged. Due to raining and non-construction of said bridges, the houses and lands are filled with rainy water. The flow of water is from the East side of road to West and the road is West side of my & villagers houses and lands.


9.                  That the crop of about 2000 acres destroyed due to the reason of stoppage of rainy water and non-construction of 03 drainage/watercourse bridges between the under constructed metaled road. Having the loss of hundred thousand to farmers of land and also landlords.


10.              That the said road is crossing from my house to village Abdullah marnas along with my house building, my house is also on the right bank of  under constructed road.


11.              That the contractor is a political influences person whose name don’t tell us by the respondent no.1. The road is constructed by another petty contractor, who has no proper machinery, engineers and workers to construct the road as per Tender and Government’s rules and regulations.


12.              That we are in very trouble because there is no crossing of water for drainage the irrigated lands and monsoon rain between whole roads which is still under construction.


13.              That the applicant lastly contacted to respondent no.01 as on dated 04.03.2015 for the construction of road with 03 bridges between the roads but the respondent no.01 absolutely refused to construct the road and 03 bridges.


14.              That the applicant has no other alternate remedy available except to appear before this Honorable Court and pray for the justice.






15.              That the applicant therefore prays for the judgment, decree and directions to concerned authorities as under,

A.    This Honorable Court may be pleased issue directions/orders to respondent no.1 & 2 to construct the 03 drainage system / water course bridges  for crossing the rain water and also to irrigate the agriculture lands between the under constructed metaled road and also to complete the whole work within time.

B.     To issue the directions to respondent no.3 & 4 to enquiry the matter & take the legal action against this corruption and interruption in work.

C.     To issue the direction to respondent no. o1 & 02 to cancel the license of contractor for this corruption and negligence.

D.    To award the other costs of the applicant for this case.

E.     Any other relief which this Honorable Court may deems fit and proper under the circumstances of this application.




Dated:                                              APPLICANT & ADVOCATE IN PERSON

Documents Filed
1. Photographs (05 in numbers)
2. P.S Copies of Applications to respondents































IN THE COURT OF DISTRICT JUDGE / DIRECTOR HUMAN RIGHTS GHOTKI
Misc: App: No.         2015


Muhammad Mithal Panhwar     …………………………           Applicant

V E R S U S

Chief Executive Engineer
Highway Division Ghotki & others ………………………       Respondents



A F F I D A V I T


I, Muhammad Mithal Panhwar s/o Abdul Rehman     by – caste Panhwar, by profession an Advocate, Resident of Village Abdul Rehman Panhwar, (Jalbani law chamber, lawyer’s street), near Ice Factory bypass, Taluka Miprur Mathelo District Ghotki do hereby state on oath as under,

1.                  That I am deponent in this affidavit and also applicant, hence well conversant with the facts of the case.

2.                  That the proposed respondents named in the application having influential persons and have committed to do not complete the construction of metaled road with 03 drainage / water course bridges between the under constructed metal road within time.

3.                  That I am stated on oath that for the sake of brevity the contents of the application may kindly be treated as part of this affidavit.

4.                  That whatever is stated above is true and correct to the best of my knowledge and belief.


Verified and signed by me at Ghotki as on dated _____ day of March 2015






                                                                        D E P O N E N T



No comments:

Post a Comment

When you look at various woman